Free download, no sign-up
When to use it
Hiring a contractor to build a whole new house, with the contractor supplying all materials and labour.
What is in this document
- Drawings, material list and BOQ attached as part of the contract
- Payment only for inspected work stages, with a 7-stage schedule
- Daily penalty for late handover, and retention
- Right to terminate and hire another contractor if work stops or is abandoned
- Warranty periods for structure and general work after handover
Sections in the document
- Scope of work
- Contract price
- Payment by work stage
- Construction period and progress reports
- Materials and quality
- Additions, omissions and changes
- Inspection of work
- Penalty for late handover
- Retention
- Warranty against defects
- Termination
- Safety and damage to others
- Permits and subcontracting
- Contact and notices
- Dispute resolution
- Attachment: work stage and payment schedule
How to use it
- Download the Word file and fill in every blank. Delete any option you do not use.
- Attach the drawings, material list, BOQ and payment schedule, and have both sides initial every page.
- Have a lawyer review it, especially for high-value work.
- Sign before two witnesses, attach the full stamp duty, and keep one copy each.
Sample text from the document
Clause 1 Scope of work
The Owner agrees to hire, and the Contractor agrees to build, a house ........................................ of .......... storeys on land title deed no. .................... located at ................................................................................. The Contractor supplies all materials, labour, tools and equipment and completes the work in full according to the attachments, which form part of this contract, as follows:
If the attachments conflict, this contract prevails, followed by the construction drawings, the material list and the BOQ in that order, or as the parties agree in writing.
Frequently asked questions
How is a house construction contract different from a labour-only contract?
In a house construction contract the contractor supplies both materials and labour, and one price covers all the work in the drawings. In a labour-only contract the owner buys the materials and hires only the labour, so the contract needs extra clauses on delivering and looking after materials.
What documents should be attached to the contract?
The construction drawings, material list, bill of quantities and prices (BOQ), work plan, payment schedule and the list of work not included in the price, plus copies of each party's ID card or company certificate.
Read more
- A free contractor agreement, written so a contractor cannot simply walk away
- How to split payments for building a house so you never pay more than the work done
- Is hiring a contractor for labour only really cheaper than turnkey?
- A full BOQ example for a single-storey 3-bedroom house
- Can foreigners build a house in Thailand?
- Getting a building permit in your own name in Thailand
- Hiring a builder in Thailand as a foreigner: what the contract needs
- Your first housing project in Thailand: which permits do you need?
- How to hire a contractor for your housing project
- Developing property in Thailand, step by step, for foreign investors
- How much does it cost to build a house in Thailand? Every payment, from real BOQs
- Construction loans in Thailand: match the contractor's stages to the bank's draws
- Home builder across Thailand: know the price before we start, in any province
- Home builder in Bangkok: every cost itemised before we start
- Home builder in Nonthaburi: every cost itemised before we start
- Home builder in Nakhon Pathom: every cost itemised before we start
- Home builder in Ratchaburi: every cost itemised before we start
- Home builder in Saraburi: every cost itemised before we start
- Home builder in Chon Buri: every cost itemised before we start
- Home builder in Rayong: every cost itemised before we start
- Home builder in Nakhon Ratchasima (Korat): every cost itemised before we start
- Home builder in Khon Kaen: every cost itemised before we start
- Home builder in Udon Thani: every cost itemised before we start
- Home builder in Chiang Mai: every cost itemised before we start
- Home builder in Surat Thani: every cost itemised before we start
- Home builder in Samut Prakan: every cost itemised before we start
- Home builder in Chaiyaphum: every cost itemised before we start
- Home builder in Buri Ram: every cost itemised before we start
- Home builder in Phitsanulok: every cost itemised before we start
- Home builder in Roi Et: every cost itemised before we start
- Home builder in Kalasin: every cost itemised before we start
- Home builder in Si Sa Ket: every cost itemised before we start
- Home builder in Lampang: every cost itemised before we start
- Home builder in Ubon Ratchathani: every cost itemised before we start
- Home builder in Sakon Nakhon: every cost itemised before we start
- Home builder in Nakhon Si Thammarat: every cost itemised before we start
- Home builder in Chiang Rai: every cost itemised before we start
- Home builder in Songkhla (Hat Yai): every cost itemised before we start
- Condominium construction: know your cost per unit before you build
- Housing estate construction: know your cost per home from day one
- Apartment and rental building construction: see the cost per room first
- Design and build: one team from the first sketch to handing you the keys
- Project construction nationwide: housing estates, condominiums and rental buildings
- Home construction in Hua Hin: we design and build homes and pool villas, every cost itemised before we start
Planning to build? See every item before you decide.
Send your location, plans or photos and we will come back with an initial scope of work.