How we work outside Bangkok
Send the location and drawings
On WhatsApp or LINE. No drawings yet is fine; we check first whether it works.
Site survey
We confirm the site survey fee before booking the visit. It is credited in full to the first payment when you sign a construction contract within 60 days.
Every cost itemised
A BOQ with materials and labour on every line, inclusions and exclusions in writing before you sign.
Build and inspect in stages
You pay when each stage is finished and inspected.
Provinces with their own page
- Bangkok
- Nonthaburi
- Nakhon Pathom
- Ratchaburi
- Saraburi
- Chon Buri
- Rayong
- Nakhon Ratchasima (Korat)
- Khon Kaen
- Udon Thani
- Chiang Mai
- Surat Thani
- Samut Prakan
- Chaiyaphum
- Buri Ram
- Phitsanulok
- Roi Et
- Kalasin
- Si Sa Ket
- Lampang
- Ubon Ratchathani
- Sakon Nakhon
- Nakhon Si Thammarat
- Chiang Rai
- Songkhla (Hat Yai)
- Hua Hin where the company is registered
Building budgets from real BOQs
| Plan | Size | Build price from the BOQ (THB) |
|---|---|---|
| T1-04 Twin Cube | Single-storey, 2 bedrooms, 39 sq.m. | 960,567 |
| T2-03 White Court | Single-storey, 3 bedrooms, 97 sq.m. | 1,646,824 |
| T2-06 Family Four | 2 storeys, 4 bedrooms, 98 sq.m. | 1,740,788 |
| T3-02 Cube Duo | 2 storeys, 3 bedrooms, 149 sq.m. | 2,646,167 |
| T4-03 Slate Hip | 2 storeys, 4 bedrooms, 190 sq.m. | 3,639,625 |
Prices include 10% overhead and 7% VAT.
Not included
- Land, filling and levelling
- Permit fees and permit drawings (we can prepare them, priced separately)
- Fence, gate, driveway outside the carport and landscaping
- Air conditioning, water heaters, loose furniture, curtains and decorative lights
- Electricity and water meter applications
Planning to build? See every item before you decide.
Send your location, plans or photos and we will come back with an initial scope of work.
Frequently asked questions
Do you really build in every province?
Yes. Send the location on WhatsApp or LINE and we will confirm the survey fee and a date to see the site.
Is the survey fee refundable?
It is credited in full to the first payment when you sign a construction contract within 60 days.


