Free download, no sign-up
When to use it
Before every payment, so you have proof the work matches the money paid.
What is in this document
- A table of the stage's work items, each marked pass or fix
- A record of fixes and the date of re-inspection
- Payment summary: retention, penalties and the net amount
Sections in the document
- Work items in this stage
- Items to fix before acceptance
- Payment summary for this stage
- Inspection result
How to use it
- Print the PDF, or fill in the Word file.
- Fill in the items to match the contract and BOQ, and attach site photos.
- Have both sides sign before paying, or before starting the changed work.
- Keep it in the same file as the contract.
Sample text from the document
1. Work items in this stage
2. Items to fix before acceptance
Frequently asked questions
Do I need an inspection form for every stage?
Use one before every payment. It proves the work is finished to match the money paid, and it lets you value the work if a contractor walks away.
After accepting a stage, can I still ask for defects to be fixed later?
Yes. The form states that accepting any stage does not waive the right to have defects found later fixed under the contract.
Read more
- How to split payments for building a house so you never pay more than the work done
- Hiring a builder in Thailand as a foreigner: what the contract needs
- How to hire a contractor for your housing project
- Construction loans in Thailand: match the contractor's stages to the bank's draws
- Condominium construction: know your cost per unit before you build
- Housing estate construction: know your cost per home from day one
- Apartment and rental building construction: see the cost per room first
- Project construction nationwide: housing estates, condominiums and rental buildings
Planning to build? See every item before you decide.
Send your location, plans or photos and we will come back with an initial scope of work.