Free download, no sign-up
When to use it
You buy the materials yourself and hire builders or a contractor for labour only.
What is in this document
- Clear on who supplies the materials and when they must reach the site
- A record of materials received, and liability if they are lost or damaged
- Labour paid by inspected work stages
- Late penalty, workmanship retention and the right to terminate
Sections in the document
- Work hired
- Labour cost and payment
- Supplying and looking after materials
- Work period
- Quality and inspection
- Penalty and workmanship retention
- Termination
- Safety
- Attachment: material receipt record
How to use it
- Download the Word file and fill in every blank. Delete any option you do not use.
- Attach the drawings, material list, BOQ and payment schedule, and have both sides initial every page.
- Have a lawyer review it, especially for high-value work.
- Sign before two witnesses, attach the full stamp duty, and keep one copy each.
Sample text from the document
Clause 1 Work hired
The Owner agrees to hire, and the Contractor agrees to carry out, the work ................................................................................ at ........................................ according to the drawings and details attached to this contract. The Contractor supplies all labour, skilled trades and tools. The Owner supplies the construction materials in the attached material list.
Clause 2 Labour cost and payment
The total labour cost under this contract is ........................................ baht (........................................), paid in .......... instalments according to the attached schedule. The Owner pays when the work of each stage is complete and has passed inspection, never more than the value of the work actually done, and only into an account in the Contractor's name.
Frequently asked questions
In a labour-only contract, who is responsible for damaged materials?
This contract makes the contractor responsible for materials received that are lost or damaged beyond normal wastage through the negligence of the contractor or workers, so every delivery should be recorded.
If materials arrive late, can the contractor delay the work?
Yes, by the actual number of days of delay, if the contractor gave the list of materials in advance as the contract requires and the owner did not deliver in time.
Read more
- A free contractor agreement, written so a contractor cannot simply walk away
- Is hiring a contractor for labour only really cheaper than turnkey?
Planning to build? See every item before you decide.
Send your location, plans or photos and we will come back with an initial scope of work.