When to use it

When choosing a contractor, before paying the first deposit.

What is in this document

  • Check identity, company registration number and company status
  • See real completed work and talk to previous homeowners
  • Compare quotations line by line
  • Check the contract terms before signing

Sections in the document

  1. Identity and reliability
  2. Real completed work
  3. Quotation and BOQ
  4. Terms before signing

How to use it

  1. Download the Word file and fill in every blank. Delete any option you do not use.
  2. Attach the drawings, material list, BOQ and payment schedule, and have both sides initial every page.
  3. Have a lawyer review it, especially for high-value work.
  4. Sign before two witnesses, attach the full stamp duty, and keep one copy each.

Sample text from the document

1. Identity and reliability

2. Real completed work

Frequently asked questions

Where can I check a contractor's company?

Check the registration number, status and directors in the Department of Business Development database, and search the company and people's names online too.

How many quotations should I get?

At least 3, from the same drawings and material list, then compare them group by group with the BOQ form.

Read more

Planning to build? See every item before you decide.

Send your location, plans or photos and we will come back with an initial scope of work.