How high to fill
- Check the road level. The floor should sit above the road so rain drains out, not in.
- Ask how high past floods reached and set the floor above that.
- Allow for the road being raised in future resurfacing.
Wait for it to settle
New fill keeps settling. If you can, fill and leave it; many owners wait through one rainy season. If not, fill in layers and compact each one.
The house still needs piles
Fill does not carry the house; piles go down to the original firm ground, so their length comes from the soil test, and deep fill can mean longer piles.
Do you need to notify anyone?
Under the Excavation and Filling Act 2000, filling above the neighbouring land over more than 2,000 sq.m., or more than the local authority sets, must be notified to the local authority first; review takes about 7 days. Either way, drainage must not flood your neighbours.
This article is general information, checked against public sources in November 2026. Laws change and every case is different. Before you sign or pay anything large, have a Thai lawyer review your own documents.
Planning to build? See every item before you decide.
Send your location, plans or photos and we will come back with an initial scope of work.
Frequently asked questions
Is filling included in your house prices?
No. Filling and levelling depend on each plot; we measure levels at the site survey and price them separately.